We handle municipal solid waste from the doorstep through to processing, primary collection and transportation, source segregation support, micro compost centre and Material Recovery Facility operations, fresh waste processing, and biomining of legacy dumpsites.
Segregation only counts if it survives the vehicle and the yard. Soil back to the site, RDF and recyclables to offtake, reject to landfill, each with a weighbridge record.
A processing facility fed with mixed waste produces very little of value and a great deal of reject. The economics of solid waste management are set at the point of collection, which is why our collection work is built around keeping wet and dry streams genuinely separate rather than simply clearing bins, the outcome SWM Rules 2016 actually requires. On the legacy side, biomining reclaims land a municipality already owns and is otherwise unable to use, and removes a standing environmental liability.
| Collection and transport | Door to door primary collection across wardsRoute planning and coverage monitoringSecondary transportation to processing or disposalDeployment of vehicles, drivers and sanitation manpower |
|---|---|
| Segregation and processing | Source segregation drives and compliance monitoringMicro compost centre operation and maintenanceMaterial Recovery Facility set up and operationFresh waste processing and composting |
| Legacy waste | Dumpsite volume survey and characterisationBiomining and screening of legacy wasteFraction separation, offtake and disposal routingLand reclamation and closure documentation |
Scope, documentation and billing are set up to match how each of these bodies actually procures and audits, rather than one format applied to all of them.
Not a list of risks in the abstract. These are the specific things we are called in to correct, and what we check for before quoting anything.
Most collection shortfalls are routing and vehicle utilisation problems, not headcount problems. We measure before adding staff.
Wet and dry separated at the household and then tipped together achieves nothing. The vehicle and the yard have to hold the separation.
A micro compost centre with no offtake becomes a second dumpsite. Offtake is planned with the operation, not after it.
Soil, RDF, inerts and metal each need a documented destination. Without it the reclamation cannot be certified.
Daily generation, the number of wards, and whether there is a legacy dump. That is enough for us to size a workable processing arrangement.