Municipal schemes are approved, funded and awarded on the strength of their paperwork. We prepare the Detailed Project Reports, estimates and tender documents that carry an underground sewerage or water supply scheme through technical sanction and procurement, built from site conditions and the current schedule of rates, not from a template.

BOQ / QTY TECHNICAL SANCTION
Quantities taken from the site, not from a template. The estimate is what the project is judged on two years later.
Typical output
DPR, estimate, BOQ, tender set
Turnaround
Four to ten weeks by scheme size
Basis
Current schedule of rates
Used for
Sanction, approval, procurement
01 SITE DATA 02 QUANTITIES 03 BOQ & ESTIMATE 04 TENDER SET SURVEY, LEVELS, EXISTING SERVICES READY FOR SANCTION
How the work runs

From site data to a sanctionable set

Each stage adds only what the next stage can be checked against. Quantities come off the ground, rates off the current schedule, and the annexures are complete before it goes up.

The documentation stage decides the project

A DPR that understates quantities becomes a cost overrun two years into execution, and a bid document with gaps is rejected at technical evaluation before anyone opens the price cover. Getting the estimate, the specification and the annexures right is the cheapest work on the whole project and the most expensive to get wrong. With AMRUT 2.0 and Swachh Bharat Mission funds flowing into Tamil Nadu sewerage and water supply schemes, the volume of documentation a ULB has to produce has risen sharply, and the scrutiny with it.

02Full scope
Reports and studiesDetailed Project Reports for sewerage, water supply and municipal schemesFeasibility studies before budget commitmentSurvey and site data collection where records are incompleteIndependent review of an existing estimate or DPR
Costing and quantitiesQuantity take off from drawings and site measurementBOQ preparation in the department formatRate analysis against the applicable schedule of ratesCost estimates with phasing and escalation
Tender and approvalTender and bid document preparationTechnical specifications and drawings scheduleAnnexures and compliance documentation for sanctionTechnical proposal support for contractors bidding municipal works
03How an engagement runs

What we are usually asked for

  • Detailed Project Report for an underground sewerage scheme (UGSS) or water supply scheme going for sanction
  • Feasibility study before a budget is committed
  • Tender and bid document preparation for a work about to be floated on the e-procurement portal
  • Independent review of an existing estimate, BOQ or rate analysis
  • Technical proposal support for a contractor bidding a municipal work

What the department receives

  • Detailed Project Report in the format the sanctioning authority expects
  • BOQ with quantity take off and supporting rate analysis against the current SoR
  • Technical specifications and drawings schedule
  • Complete tender document set with annexures
  • Implementation plan with phasing, milestones and manpower deployment
04Who this is for

Scope, documentation and billing are set up to match how each of these bodies actually procures and audits, rather than one format applied to all of them.

05Questions we are asked
Can you prepare the DPR, estimate and BOQ for an underground sewerage or water supply scheme?
Yes. We prepare the full documentation set, survey and data collection, design basis, quantity take off, rate analysis against the applicable schedule of rates, BOQ, specifications and the annexures the sanctioning authority requires. Timelines depend on scheme size and the survey data already available; we confirm a firm schedule after a site visit.
What information do you need from the ULB to begin a DPR?
Typically the ward or coverage boundary, population and projected growth figures, existing network drawings where they exist, details of current assets such as headworks, OHTs or pumping stations, land availability for treatment units, and the scheme under which funding is being sought. Where records are incomplete we carry out the survey ourselves.
Do you also prepare bid documents for contractors, not just for departments?
Yes. We support contractors preparing technical proposals and bid submissions for municipal works, quantity verification, rate analysis, method statements and compilation of the technical cover. This is separate from any consultancy carried out for a department on the same work.
Where it goes wrong

Four ways project consultancy quietly fails.

Not a list of risks in the abstract. These are the specific things we are called in to correct, and what we check for before quoting anything.

  1. 01

    Quantities taken from the drawing

    Not from the ground. Rock, water table and existing services are what change the rate, and none of them appear on a layout sheet.

  2. 02

    Rate analysis left at the last revision

    An estimate built on a superseded schedule of rates fails technical scrutiny before anyone reaches the price cover.

  3. 03

    Annexures missing from the tender set

    Complete drawings, specifications and compliance formats are what let a bid be evaluated at all. Incomplete sets are simply returned.

  4. 04

    No phasing against the sanctioned budget

    A DPR that ignores how the release actually arrives produces a work that stops halfway and needs revalidation.

Send us the scheme and the sanction stage.

We will tell you what the DPR, the estimate and the tender set need to contain before it goes up for approval.