Home › Services

Eight divisions,one accountable partner.

Consultancy, construction, operations, waste and environmental management. Each division has its own page with the full scope.

RCC COVER & FRAME INCOMING 300mm OUTGOING 300mm BENCHING & CHANNEL FALL 1:20 GROUND LEVEL INVERT DEPTH 1 2
Manhole and sewer connection, sectional detail
Across every division

What does not change, whichever scope you need.

The eight divisions differ in what they do. These four are the same in all of them, and they are the ones worth checking a contractor on.

01

One contract, one point of contact

Whichever divisions a scheme touches, the department deals with a single contracting party, a single bill and a single person who answers for the whole of it.

02

Zero manual entry, without exception

Mechanised cleaning and confined space protocol on every sewerage deployment. This is not negotiable on price and never has been.

03

Documented as the work proceeds

Daily logs, joint measurement, disposal records and monthly reporting are set up in the first week, not reconstructed at the final bill.

04

Scoped to what can be sustained

Against the operating budget a body will actually have after handover, rather than the sanction figure that wins the award.

Start here

Two questions, and we will point you at the right division.

Most enquiries arrive described by the problem rather than by the scope. Answer these and you will land on the page that actually covers it.

01 What is the situation on the ground?
How it runs

From the first enquiry to the handover.

The same sequence whichever division a scheme starts in, so a department knows what happens next without asking.

  1. 01

    Enquiry

    You send the location, the scope and the stage it has reached. We come back within one working day, and say plainly if it is not work we should be doing.

  2. 02

    Site visit

    For anything beyond a supply item. A price given without seeing the ground is a price that changes later.

  3. 03

    Proposal

    Scope, method, programme and a cost built from the current schedule of rates, with the assumptions written down where you can check them.

  4. 04

    Mobilisation

    Plant and crew from Sirkazhi, within a day across the delta districts. Records and reporting formats agreed before work starts.

  5. 05

    Execution

    Joint measurement as the work proceeds, with the agreed documentation produced at the interval you asked for rather than at the end.

  6. 06

    Handover and after

    Completion documentation, as executed records, and the operating arrangement if the contract carries one.

Not sure which scope fits?

Send the tender document or a short description of the site and we will map it to the right service scope.